------=_NextPart_000_006F_01C56889.BF712A00 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable A new concrete floor was put in when the church was rebuilt, for which J Ta= ylor & Co provided a bell 31" diameter in C; hung dead in a steel frame for= manual chiming, "designed as one of the bells of a future rinigng peal". T= hat didn't happen either and the church was eventually closed.=20 [Was the church actually damaged much by the fire? I seem to recall seeing = photos of the inside still with much original work - was it just the tower = which was gutted?] David ------=_NextPart_000_006F_01C56889.BF712A00 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable