<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content="text/html; charset=iso-8859-1" http-equiv=Content-Type>
<META name=GENERATOR content="MSHTML 8.00.6001.18783"></HEAD>
<BODY style="BACKGROUND-COLOR: #ffffff" bgColor=#ffffff>
<DIV><FONT size=2 face=Arial>From your description I am not clear if the 
original RSJ is also within the window opening or extends to the outer walls 
either side of it? </FONT></DIV>
<DIV><FONT size=2 face=Arial>If it is, the brickwork securing the existing RSJ 
has to be disturbed to remove it to fix the replacement. This then has to be 
made good before the surface fixing can take place. Surely the building in of 
the new channel  is just part of the making good process.</FONT></DIV>
<DIV><FONT size=2 face=Arial>If not, presumably the Engineer and contractors 
have sufficient experience to guarantee the spec.</FONT></DIV>
<DIV><FONT size=2 face=Arial>Does the window cill provide support for the new 
channel? </FONT></DIV>
<DIV> </DIV>
<DIV><FONT size=2 face=Arial>Peter Trent</FONT></DIV>
<BLOCKQUOTE 
style="BORDER-LEFT: #000000 2px solid; PADDING-LEFT: 5px; PADDING-RIGHT: 0px; MARGIN-LEFT: 5px; MARGIN-RIGHT: 0px" 
dir=ltr>
  <DIV style="FONT: 10pt arial">----- Original Message ----- </DIV>
  <DIV 
  style="FONT: 10pt arial; BACKGROUND: #e4e4e4; font-color: black"><B>From:</B> 
  <A title=aaspland@rgY8ITtWWQJ6ryCQPurrRb3vjLsBinnPxclI5lwJ1kYvHouKFrAvHvfBMIzrNOfaDpgcofKU8klKQ4lvrmSKfAjZxImGyhg.yahoo.invalid href="mailto:aaspland@w58IOzTjTBfexBVzSYYUPK7TYwel0ksKbHpJDyHeOUYteRphFdS9usCqXENWcIaqyTIrmuCKFFodKAFKdsx3.yahoo.invalid">Andrew 
  Aspland</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>To:</B> <A 
  title=bellhistorians@yahoogroups.com 
  href="mailto:bellhistorians@yahoogroups.com">Bellhistorians</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>Sent:</B> Thursday, July 16, 2009 6:33 
  PM</DIV>
  <DIV style="FONT: 10pt arial"><B>Subject:</B> [Bell Historians] </DIV>
  <DIV><BR></DIV><SPAN style="DISPLAY: none"> </SPAN> 
  <DIV id=ygrp-text>
  <P>Dear Historians<BR>Could you indulge me with some very recent history (so 
  recent it may be in<BR>the future) and allow me to pick your technical 
  brains?<BR><BR>I have a DAC proposal infront of me which includes removing a 
  120mm by 120mm<BR>I section steel beam and replacing it with a 152 by 89 RSC 
  (rolled steel<BR>channel?). This beam currently spans a window opening, being 
  built into the<BR>brickwork either side, and supports the ends of two steel 
  bellframe beams.<BR>The replacement would be bolted to the inside faces of the 
  wall either side<BR>of the window opening and take over the job of supporting 
  the beam ends.<BR>The "fixings into the wall to be stainless steel with 
  neoprene isolation<BR>washers. Fixings to be made into brickwork joints where 
  possible." There<BR>are six bolts proposed at each end of the beam though the 
  bolts' dimensions<BR>are not given. This is to allow room between the louvres 
  and the steelwork<BR>for a telecommunications antenna.<BR><BR>I have 
  reservations about chopping up bellframes to get antennae in and I<BR>would 
  appreciate the technical people commenting on the suitability of 
  the<BR>replacement beam. My own feeling is that the strength of the new beam 
  may<BR>well be equal or even better than the former BUT the fixings concern me 
  -<BR>bolting onto the surface of the brickwork seems a lot less satisfactory 
  than<BR>building ends in.<BR><BR>I need to respond to the DAC fairly quickly. 
  Could members of this list<BR>please comment on the 
  proposals?<BR><BR>Thanks<BR>Andrew<BR><BR></P></DIV><!--End group email --></BODY></HTML>